SOME OF THE RECENT PROJECTS COMPLETED                                                      
 
RABIGH PHASE II PETROCHEMICAL PROJECT
Final Inspection and Performance Test of Cryogenic Control Valves as per DIN EN 1226 and ANSI FCI at Samson AG/Frankfurt, Germany on behalf of Petrofac..
                  
TAKREER CARBON BLACK&DELAYED COKER PROJECT
Final Inspection and Performance Test of Sulphur Pumps with Motors and Coupling as per API 610 at Friatec/Wiesbaden, Germany on behalf of Samsung Engineering..
                 
ARL UPGRADATION PROJECT
Final Inspection and Performance Test of Sulphur Pit and Sulphur Transfer Pumps
with Motors and Coupling as per API 610 at Friatec/Wiesbaden, Germany on behalf of Hyundai Engineering.
 
AIN ARNAT COMBINED CYCLE POWER PLANT
FAT of Centrifugal Pumps with Couplings and Motors for Air Cooled Condenser as per ISO 3555&9906 at KSB/Pegnitz, Germany on behalf of Hyundai Engineering.
O-MON THERMAL POWER PLANT
FAT of LV Switch Gears, MCC and LT DIST Panels as per IEC 60439 at Natus GmbH/Trier, Germany on behalf of Daelim.
 
FLARE GAS RECOVERY PROJECT
FAT and Final Inspection of Local Panels as per IEC 60079&60947 at Eaton’s  Crouse-Hinds /Eberbach, Germany on behalf of Intecsa.
 
ZAULIAH GAS PLANT PROJECT
Final Inspection and FAT of Centrifugal Compressor Motor as per IEC 60079 and Shell DEP at GE Power Conversion/Champigneulles, France on behalf of Tecnicas
Reunidas.
 
SHINBORYUNG POWER PLANT PROJECT
Witness of Winding Resistance Test, Insulation Test and High-Voltage Test for Motor for Circulating Pump as per DIN EN 60034-1at KSB / Homburg, France on behalf of
Doosan Heavy Industries.
 
MOHO NORD TLP PROJECT
FAT of AC&DC UPS Protection Systems as per IEC standards AEG / Warstein,
Germany on behalf of HHI.
 
IEFCL FERTILIZER PROJECT
FAT of Purifier Expander Generator as per IEEE 43:2000 at Siemens &
Cryostar/Nürnberg, Germany on behalf of Toyo Engineering.
 
SADARA PETROKEMYA ABS PROJECT
Following inspection activities were performed on behalf of John Zink Hamworthy:
Final Inspection (Pressure Test and PMI) of Cartridge Filters as per ASME VIII at Boll&Kirch / Kerpen,Germany.
Final Inspection various for Flat Steels, Hex-Head Screws, Nuts, Washers, Clamps, Clamping Plates, Radials, Baffle Plates, Steel Anchors, Electrodes at Weber
GmbH /Braunfels, Germany. Final and Packing Inspection of Combustion Air Blowers and Cooling Air Fans at Fima GmbH/Obersontheim, Germany.
 
TÜPRAŞ RESID UPGRADING PROJECT
Following inspection activities were performed on behalf of Tecnicas Reunidas:
Pre-Inspection Meeting, In-Process-and Final Inspection of Liquid Sulphur Loading
Arms at EmcoWheaton GmbH / Kirchhain, Germany
Final Inspection of various Globe,-Gate,-Ball,-Control and Check Valves at KIHSCO
GmbH /Nauheim, Germany
Performance Test of Electric Motor Driven Fire Water Pump at Nijhuis Pump BV /
Winterwijk, The Netherlands.
Final Inspection of Pressure Vessels and High Pressure Separator in accordance with PED97/23/EC at Stabo / Siegen, Germany.
FAT and Final Inspection of Hydraulic Power Unit at Watz / Siegen, Germany.
 
Final Inspection of Storage Tanks acc. to DIN 6616, Vessels and Collecting Vessels          PED 97/23/EG AD 2000 at Krämer Industries / Rain am Lech.
 
SAKHALIN II OPF PROJECT
On behalf of ENKA&BECHTEL JV were carried out following inspection activities:
Packing and Visual Inspection of Enclosures with heater at Multi Instrument
BV/Gorinchem, Netherlands
Final Inspection of Main Shaft and Impeller Hub for FDF and PAF Fan at
KK&K/Frankenthal, Germany
Final Inspection of Air Filters and Transmitters at Emerson Process Management
Karlstein, Germany
 
SHELL MEG PROJECT
On behalf of Foster Wheeler Energy Ltd were carried out following inspection  activities:
Final Inspection of diverse sizes Safety Relief Valves at Bopp & Reuther/Mannheim,
Germany
FAT of 33kV Gas Insulated Medium Voltage Switchgears acc. to IEC 62271 at ABB AG Ratingen, Germany
Final Inspection of Power Junction Boxes at Cooper Crouse –Hinds GmbH/Eberbach,
 
 
CHILE COPPER MINING PROJECT
Final Inspection including with FAT of Harmonic Filters at Gino GmbH /Bonn, Germany on behalf of Vale.
 
GORGON LNG PROJECT
Final Inspection of various Pressure and Temperature Transmitters at Emerson Process Management /Karlstein, Germany on behalf of CBI.
 
AMMONIA AND UREA PLANTS IN MARY
Final and Packing Inspection of various Filter Anthracite for Water Units at Silcarbon
Aktivkohle GmbH /Hopsten, Germany on behalf of Doosan.
 
ABADAN REFINERY RENOVATION PROJECT-PHASE III
On behalf of Petrochemical Industries Design and Engineering were carried out following inspection activities:
Final Inspection of various sizes Sliding Stem Control Valves with Actuator,
Positioner and Air Filter Regulator, in acc. with ASME, IEC, NAMUR and ANSI
standards at Samson/Frankfurt, Germany
Pre-Shipment inspection of Water Injection Systems at Cemag/Hameln,
Germany
Final Inspection of Ball valves, Butterfly valves, -Check valves, Gate valves, Globe valves, Plug valves and Plastic lined Valves at Perrin/Nidderau, Germany.
Packing and Visual Inspection of Temperature and Pressure Transmitters at Emerson Process/Karlstein, Germany
Final inspection (Review 3D Measuring test protocol, Balancing of power elements, NDT records and Material test certificates) of Couplings for Motor and Fan at ATEC &Flender / Vreden, Germany
Pre-Shipment inspection of Water Injection System for Cement Mill at Cemag/Hameln, Germany
Final Inspection (DFT, Visual and Dimensional Check, Witness of Pressure and Leakage test, Check of shop erection-balancing, Review of Documentation) of 3 pcs Loading Arms at EmcoWheaton
 
UPPER ZAKKUM Project for ZADCO ISLANDS SURFACE FACILITIES PROJECT – EPC2 PROJECT
Stage Inspection on 132kV Gas Insulated Switchgear (GIS) Vendor ABB-Germany on
behalf of Petrofac + DSME ML&P Anchorage –
 
ML&P Anchorage – Plant2 Expansion Project
FAT - SF6 Gas Insulated Switchgear – 145 kV - Vendor ABB Germany – on behalf of Quanta Power Generation
 
PLANT2 EXPANSION PROJECT
FAT - SF6 Gas Insulated Switchgear - 145 kV - Vendor ABB Germany – on behalf of Quanta Power Generation
 
MALAYSIA TNB FAST TRACK 3A PROJECT
PIM - Condensate Polishing Plant – Contractor Sumitomo Corporation + TEPSCO on behalf of DAELIM - Stage Inspection
 
TOTAL E&P ANGOLA 32 PROJECT
Stage Inspection on behalf of Bluewater Vendor : Flowserveon behalf of Saipem
 
Ichthys Onshore LNG Facilities Project 
Component Inspection of Emergency Switches, JKC – Inpex – Vendor EATON Germany - on behalf of JGS
 
ONSHORE LNG FACILITIES PROJECT
Component Inspection of Emergency Switches , JKC – Inpex – Vendor EATON Germany – on behalf of JGS
 
16120 DAP/NPK Plant MA’ADEN Project
FAT on various Pumps, Vendor: Friatec Germany Final Inspection on behalf of Intecsa International
 
EGYPTIAN POLYETHYLENE PROJECT
Final Inspection – Vendor Industronic Germany – on behalf of Toyo Engineering
 
 
SHINBORYEONG / Korea
Interim Inspection of Boiler Circulation Pumps – Vendor KSB Germany – On behalf of Doosan Heavy Industries
 
RABIGH II – JI-2014 ( ARAMCO) PROJECT
Vendor Samson AG Germany – On behalf of Petrofac Dubai
 
MARINER TOPSIDE PROJECT
FAT of UPS Packages, On behalf ofCB&I UK Limited – Vendor: Suplier Schneider Electric Switzerland
 
CANADIAN NATURAL RESOURCES LTD. TAILINGS TRAIN 1& 2 RETROFIT
PIM, Vendor Siemens Germany on behalf of Worley Parsons
 
AEGEAN REFINERY PROJECT
FAT – SF6 Gas Insulated Switchgear - Vendor ABB Germany -  On behalf of TECNICAS REUNIDAS
 
S.A MALAYSIA TNB FAST TRACK 3A
Hydrostatic Testing - Vendor: AIN Alfons Ickenroth GmbH - On behalf of Daelim
 
ARL UPGRADATION PROJECT 2013 (ATOM) –
Final Inspection - Friatec Wiesbaden - On behalf of Hyundai Engineering
 
BEAUMONT LMA PROJECT
Mechanical Testing and FAT - Vendor Samson AG Germany - On behalf of Air Liquide
 
JV- PLANT SOHAR ( OMAN)
Final and Packing inspection, Vendor: IMI Bopp & Reuther Germany
 
FAST TRACK PROJECT 3A
Low and high pressure hydro testing - Vendor IMI Bopp & Reuther Germany - On behalf of Daelim
FAT on steam valves - Vendor IMI Bopp & Reuther Germany - On behalf of Macchi / Sofinter
 
KAOMBO PROJECT – TOTAL E&P ANGOLA BLOCK 32
Ultrasonic Examination - Client Bluewater Energy Services B.V. - Vendor: Brück GmbH - On behalf of Sofinter
 
IEFCL PROJECT
FAT of Puifier Expander Generators , Vendor: CRYOSTAR – On behalf of Toyo Engineering
 
BP Q204 PROJECT
FAT of Self-lubricating plates, Vendor Federal-Mogul Deva GmbH – On behalf of Hyundai Engineering
ERC PROJECT
Interim Inspection of LocalPanels – Vendor: Eaton Cooper Crouse Hınds – On behalf of GS Engineering PDVSA – Loading Arms – PIM – Vendor: EMCO WEATON GmbH
 
PDVSA – Loading Arms Project
PIM – EMCO WEATON GmbH – On behalf of ACES-GQS
 
IBN SINA POLYOXYMETHYLEN PROJECT
Client: Kingdom of Saudi Arabia – FAT of Thermowells
 
RITP PROJECT
FAT of Combustion Air Blowers, Vendor FIMA – On behalf of John Zink Hammworthy
 
HITACHI HI 
FAT of Export Gas Compressors, Vendor: GE Power Conversion France – On behalf of GL Noble Denton
 
CBDC PROJECT, TAKREER
FAt of Sulfur Degassing nd Transfer Pumps, Vendor Friatec GmbH – On behalf of Samsung Engineering
 
DAP/NPK PLANT MA’ADEN PROJECT
Running Test of Second TGS Pumps – Vendor Friatec GmbH – Client Intecsa Industria -
 
UMM WU’AL EPC PROJECT
Slurry Pumps – Running Tests – Client Intecsa Industrial – Vendor Friatec GmbH
 
AURORA- EOS PROJECT
Rotor balancing Testings – Vendor: GE / France - On behalf of MES  
Kais Combined Cyle Power Plant – Bladder Accumulator HPU testing – Vendor:  Hydac / Germany – On behalf of DAELIM
 
EEPE PROJECT
FAT of Paging & Intercom stations, Vendor: Industronic GmbH – On behalf of CES-GQS
 
ICHTHYS ONSHORE LNG FACILITIES PROJECT
FAT of Emergency Switchs, Vendor: Eaton – On behalf of JKC Client Doosan Heavy Industries – No-Load, Locked-Rotor Test – Vendor KSB
 
FAST TRACK 3A 1X1000 MW COAL FİRED POWER PLANT PROJECT
No-Load and Rotor Tests of Medium Voltage Motors for Recirculating Pumps, No-Load and Rotor Tests – Vendor: KSB – On behalf of Daelim
BXCD PROJECT
FAT of Ammonia / Urea Handling Equipment, Vendor ProMinent GmbH – ON behalf of Daelim
 
 
BEAUMONT LMA PROJECT
FAT of Control Valves,  Vendor:  Samson AG / Germany On behalf of Air Liquide                       
 
6130 DAP/NPK PLANT PROJECT
FAT of Control Valves and Silencers, Vendor Samson AG / Germany – On behalf of ACES-QGS
 
GORGON PROJECT
Barrow Island LNG Plant – For Kellogg Joint Venture – VendorEmco Wheaton / Germany
Procurement of Spare Parts for oil and gas flowlines Exxon Neftegas Limited – For Flour – Vendor Emerson Germany
 
THE MANGALORE PTA PLANT at MANGALORE SEZ PROJECT
Interim Inspection for Technip – Vendor Tankbau Abersfelder Germany
 
ANPZ HYDROCRACKER COMPLEX PROJECT
For MAVEG – FAT - Vendor Sandvik Process Systems
 
AEGEAN REFINERY PROJECT (ARP)
For TSGI – Hydrotest and Performance Test – Vendor Sulzer Pumpen GmbH / Germany
 
RD4-NAPHTHA CUT POINTER PROJECT
Hydrotest and Performance Test – Vendor Sulzer Pumpen GmbH / Germany
 
LCCP Project
Final inspection,Load running test. Vendor: Schenck Process GmbH - Toyo Engineering Corp.
 
CULZEAN FIELD PROJECT
Bi-weekly Progress inspections on Seperators and Critical Process Vessels (ME-024) – for MAERSK OIL – on behalf of ABS SMOE – Vendor: Hans Leffer GmbH – Saarbrücken / Germany
 
EXECUTION OF GAS COMPRESSION AND REINJECTION STATION – ZCINA Sonatrach
Hydrotest on 2nd stage after cooler –for Airpack Nederland BV – Customer Dodsal Eng & Construction FZE – Vendor: SEAB GmbH / Germany
 
SWCC YANBU #3 POWER & DEALINATIONPROJECT
Packing inspection of Public Adress and Call Station Sytems – forSamsung Engineering Co.LTD – on behalf of TÜV /  SECL – Vendor: INDUSTRONIC -L&T Electrical & Automation FZE  - Wertheim / Germany
 
STATION DE TRAITEMENT D’OUM AZZA (MAROC) PROJECT
FAT onHorizantal and Vertical Pumps, Compressors, Change over devices and Expansion vessels, Booster stations, Eveporators– for ACCONIA – on behalf of ABS SMOE – Vendor: Hans Leffer GmbH – Saarbrücken / Germany
 
UHP Project( Umm Al Houl Power ) Qatar
Function Test, Insulation Test, Voltage Withstand Test, Calibration Status of Measuring Equipments, Painting / Acid Cleaning, Reviewed Vendor’s Documents, Material Verification
Visual & Dimensional Inspection, For Samsung C&T Engineering & Construction Group,on behalf of EdifNDE, Vendor ABB AG – Hanau / Germany
 
SNSE3 Nippon Shokubai PROJECT
FAT Cooling water cooler Plate Heat Exchanger, Chiled Water Heater Plate Heat Exchanger– on behalf of: NIPPON SHOKUBAI EUROPE N.V. ,Vendor: API Schmidt-Bretten GmbH and CO & KG, Bretten / Germany
 
Gorgon Project, Barrow Island LNG Plant
Pre-shipment inspection of Marine Loading Armsperforming Correctness of packing and marking, quality of packingChecking of presented items against packing, Verification of attached shipment schedule, Photos of the inspected items on behalf of Chevron Australia Pty. Ltd.,Vendor: EMCO WHEATON, KIRCHHAIN - Germany
 
Petronas Rapid PROJECT
FAT Liquid Sulphur Pumps (Performance and Run test)– for Enersul Limited Partnership – on behalf of Petrofac Vendor: Friatec AG -Wisbaden / Germany
 
PPG WAREHOUSE(Exxon Neftegas) PROJECT
Commissioning Inspection – of Procurement of spare parts for Oil and Gas flowlines – on behalf of FLOUR, Vendor: Emerson Process Management GmbH & CO / 63791 Karlstein - Germany
 
JFC III–(ODI 3)@P2 SitePROJECT
Performance and Hydro test on FSA Scrubber Pumps– for Jorf Fertilizers Company III – on behalf of Jacobs,Vendor: Friatec Rheinhütte Pumpen GmbH/ Rennrod / Germany
 
TURKENBASHI INTERNATIONAL SEAPORT PROJECT
Pre-Shipment inspection of Plasma Cutting Machines– for GAP Insaat Yatirim ve Dis Ticaret A.S.(via RINA) – on behalf of EdifNDE,Vendor: ESAB Welding & Cutting GmbH – 61164 Karben / Germany
 
EPCC of ARU, SRU, SWS, LSSU and SSU PROJECT
FAT Liquid Sulpher Pumps– for Enersul LP – on behalf of Petrofac (Petronas)Vendor: Friatec (Rheinhütte) GmbH – Wisbaden / Germany
 
BPLK214 - LOTOS PROJECT
Hydrostatic test, CE check of Dosing Pumps-for KT Kinetics Technology S.P.A– on behalf of EdifNDE -Vendor: Prominent GmbH - 69123 Heildelberg / Germany
 
EFRA Project - LOTOS Asfalt
Hydrostatic test, CE check of Dosing Pumps-for KT Kinetics Technology S.P.A– on behalf of EdifNDE -Vendor: Prominent GmbH - 69123 Heildelberg / Germany
 
SBF PTA Plant Project Site, Mangolore SEZ Karnata - INDIAFAT on Water Seperators  – for Technip India Ltd (Siemens)  – on behalf of EdifNDE -  Vendor: Tank + Stahlbau Abersfelder - 97795 Schondra Schildeck / Germany
 
SOUTHERN SWAMP ASSOCIATED GAS SOLUTION (SSAGS) PROJECT
Factory Acceptance Test of Ultrasonic Flow Meters – for Saipem and Desicon – on behalf of AppVelosi- Vendor: Elster GmbH – 55252 Mainz-Kastel / Germany
 
CT LITORAL PROJECT
To monitor and provide detailed information about the progress of the fabrication and assembly process, technical documentation related the project, drawings, specifications of Heat Barriers, Pump casing, Discharge Nozzle,
Motor Housing + cover and Diffuser– for Endesa Generacion – on behalf of AppVelosiVendor: KSB Aktiengesellschaft - 67227 Frankenthal / Germany
 
SKNPC Clean Fuels PROJECT
Visual Inspection / Dimensional Check / Insulation Resistance Test / Operation Test / Final Inspection / Packing Inspection & Issue IRC of Junction Boxes On behalf of JGSK (JOINT VENTURE) Vendor: Bartec GmbH / 97980 Bad Mergentheim,
 
PDIL, Gambat South GPF-II PROJECT
FAT on Genset with CG260-12 type engine
Test bed preparation status and checking and preparation for the FAT
Powering the Genset gradually and observation of initial values, Reaching critical 100% max power and witnessing all stages, checking and comparing valuesto existing data-sheets and previous FAT results, Stepping down to97% at sitepower level and checking and comparing values to existing data-sheets andprevious FAT results ,Recording data and preparing FAT report On behalf of Descon International (Pvt) Limited, Vendor Caterpillar GmbH / Germany
 
SHELL NIGERIA (SPDC) PROJECT
Witness Performance Test and FAT / Marking & Tagging / Dimensions & Workmanship of Ultrasonic Flow Meters – on behalf of Saipem Spa,Vendor: Elster GmbH – 55252 Mainz-Kastel / Germany
 
Effluent Water Treatment And Injection Plant (NK) PROJECT
FAT of PAGA System with Central Controller / PAGA cabinet /PAGA Master Access Unit / Portable PC Workstation with PAGA System Management Software / Outdoor Field Access Panel / Hazardous Area Field Access Panel with Flashing light / External Interfaces with Fire & Gas, Telephone System and DCS Systems, steps including :
Visual Inspection Equipments, Verification of Bill of Materials, Dimensional check, Tagging
Function tests based on configuration, Fault simulation, Verification of Alarms, Verification of Power Supply - for Kuwait Oil Company K.S.C. (I&C)– on behalf of Commtel Networks,  Vendor: Industronic GmbH & Co. KG, 97877 Wertheim/ Germany
 
 
 
McDermott (FLOW ASSURANCE EXPANSION) PROJECT
NDE & Hydrostatic for Process Piping & Hardness test on basemetal HAZ and weld on MEG INJECTION PUMP SKIDS–on behalf of RASGAS,Vendor: Lewa Gmbh -70499 Stutgart / Germany
 
Nexen ‘Scott’, ‘Buzzard’ and Golden Eagle Offshore Installations PROJECT
Visual inspection, doc review and release on ILI pigging tool c/w anciliarys – on behalf of Nexen Petroleum U.K. Limited,Vendor: NDT Global GmbH & Co, 76297 Stutensee/ Germany
 
CENTRAL GAS PROJECT - III  - Bahrain National Gas Expansion Company (S.P.C.)
Witnessing Lube Oil Cooler skids:
Inside Visual cleanliness check, Visual Examination inside and outside, Leakage Test
Hydrostatic Pressure Test with oil, Cleanliness check, Flushing (API 614 with particle device )
Dimensional check and thickness check, Main-Dimensional check, Check of markings, Painting, FAT ( Quality control, Cleanliness, Vibration, Noise check), Packing Inspection (Open box inspection for parts shipped ), Preservation check and packing check
MDR review- for Bahrain National Gas Expansion Company (S.P.C.) – on behalf of JGC Italy Srl,Vendor: Oeltechnik GmbH, 68753 Waghausel  / Germany
 
WASTE WATER TREATMENT PACKAGE FOR TREATED INDUSTRIAL PW PROJECT
FAT and Performance Tests on Dosing pumps and motors– for SUEZ – on behalf of RASGAS COMPANY LIMITEDVendor: Prominent GmbH - 69123 Heidelberg/ Germany
 
​Final assembly and dimensions and Load Test of Manual Pillar Jib Cranes with MCH– on behalf of Al-Khadda International General Trading & Contract,Vendor Vetter Krantechnik GmbH - 57080 Siegen / Germany
 
Petrobel K248 PROJECT
Visual, Dimension, Tags’s check and Certification Review of Pressure gauges, temperature gauges, thermowells– on behalf of Kinetics Technology and Eni SpA,Vendor: WIKA Alexander Wiegand SE & Co. KG,63911 Klingenberg am Main/ Germany
 
Freeport LNG (USA) PROJECT
FAT on Gas Insulated switchgear ,-on behalf of CB&I & ZACHRY Joint Venture (CZJV),Vendor: ABB GmbH 63457 Hanau/ Germany
 
Freeport LNG (USA) PROJECT
Visual check, Dimension check, Pre-packaging inspection on Gas Insulated switchgears ,-on behalf of CB&I & ZACHRY Joint Venture (CZJV),Vendor: ABB GmbH 63457 Hanau/ Germany
 
ExxonMobil Rotterdam Advanced Hydrocracker PROJECT
PMI testing on API Safety Valves,– for HITMA – on behalf of Fluor -Vendor: Bopp& Rueter GmbH -68305 Mannheim / Germany
 
ANPZ HYDROCRACKER COMPLEX PROJECT
Packing inspection on complete parts of hydrocracker– for Euro Petroleum Consultants– on behalf MARVEG / Sandvik Process Systems -Vendor: Cargopack GmbH, 71709 Markgröningen / Germany
 
Jurassic Production Facility (JPF) at Sabriya PROJECT
Hydrostatic Test of Volute Casing, Suction Cover, Discharge Bend, Suspension Pipe, Support Column, Column Pipe and Heating Jacket of Sulphur Transfer Pumps– on behalf of Siirtec Nigi -Vendor: Friatec Rheinhütte Pumpen GmbH - 65203 Wiesbaden/ Germany
 
YIBAL KHUFF PROJECT (YKP) PROJECT
Pump Inspection as per API – Hydro, Performance, Mechanical Run Test of Dosing Pumps – for PDO Oman – on behalf of Petrofac -Vendor: ProMinent GmbH, 69123 Heidelberg/ Germany
 
Freeport LNG Liquefaction PROJECT
FAT on MEDIUM VOLTAGE GIS SWITCHGEAR 60SG-MV-001A/B– for CB&I – on behalf of Zachry Industrial Inc.Vendor: SIEMENS AG, FRANKFURT AM MAIN/ Germany
 
Coal Fired Power Plant KALSEL-1 PROJECT
Mechanical no-load test with rated speed of 3000 RPM, Short circuit tests with rated current and speed, No-load test with rated voltage and speedon Turbo Generator SGen5-100A-2P 100-34 – for CB&I – on behalf of Hyundai -   Vendor: SIEMENS AG, 99086 Erfurt  / Germany
 
Project A6HO 
Shop Inspection of Strech Cylinders for review VT, UT, PT, Surface finish, review of MDB - Vendor: Walter Hunger GmbH & Co. KG, On behalf of: ALCOA / FLOUR
 
VINH TAN THERMAL POWER PROJECT
FAT for FOR GAS CHLORINATION SYSTEM - Vendor: Grundfos Water and Treatment Solutions GmbH - On behalf of DOOSAN, Mitsubishi Corporation, EVNPECC, PACIFIC Corporation
 
 
ANPZ HYDROCRACKER COMPLEX Project
183700 -Recycle Oil Filter Pressure Test - Vendor: HYDAC Filtertechnik GmbH, On behalf of MAVEG
 
Cameron Liquefaction Project
1844440 – Multiple intermediate and Final Inspection of Seal Gas Panels - Vendor: John Crane GmbH - On behalf of CCJV
 
 
KLONGLUANG UTILITIES PROJECT
Performance test, Vibration and Noise level check, Hydro Tests - Vendor KSB Germany - On behalf of TTCL Public Company Limited, Mitsubishi Corp., TOYO THAI Malaysia SDN.BHD.
 
KNPC Clean Fuels Project
Visual Inspection, Dimensional Check, Insulation Resistance Test, Operation Test & Issue IRC - Vendor: Bartec GmbH - On Behalf of JGSK and Applus Velosi
 
CT LITORAL Project
Progress of the fabrication and assembly process - Vendor: KSB Germany -On behalf of Endesa Generación and Applus Velosi
 
16100 - IBN SINA POLYOXYMETHYLENE PROJECT
FAT of (ISBL) NiR Probes and Analyzers - Vendor: Bruker Optik GmbH - On behalf of INTECSA and GIS
 
Culzean Field Development Project
Progress Inspection of SEPARATORS & CRITICAL PROCESS VESSELS- Vendor: Hans Leffer GmbH & Co. KG - On behalf of ABSG CONSULTING INC ( MAERSK Oil) and GIS
 
CULZEAN FIELD DEVELOPMENT Project
Progress Inspection / Final Inspection - Vendor: Hueber Getriebebau GmbH - Supplier: SIEMENS Netherland N.V - On behalf of SMOE and MAERSK Oil – GIS
 
STATION DE TRAITEMENT D’OUM AZZA (MAROC) Project
Partial Inspection with Functional tests of Booster Stations, Change over units, Evaporator units- Vendor: Grundfos Water Treatment Solutions - On behalf of ACCIONA AGUA / I’ONEE / Marocco
 
TENGIZCHEVROIL FGP / WPMP PROJECT
FAT of 110 kV High Voltage Gas-Insulated Switchgear - Vendor: Siemens AG - On behalf of PJV Kazagistan
 
MEG Energy eMVAPEX Recycle Project
Intermediate Inspection of MV Switchgear - Vendor: Siemens AG - On behalf of MEG Energy
 
Al-Zour Refinery Project
Final Inspection of Lighting Fixtures for Visual Dimensions, Drawings + Quality Control Plan, WPS, NDE - Vendor: Stahl GmbH – On behalf of KNPC Tecnicas Reunidas SEG HanWha
                                                                                                             
RNP DCU Plant (WP1) Project
PIM / Hydrotests / Surface Protection / Painting inspection of Sour Water Filters, Amine Particle Filter, Backwash Water Drums - Vendor: Faudi GmbH - On behalf of CBI / NIS - Gazprom
 
 
MP & SAP Energy Project
intermediate Inspection of Globe Valves, Vendor: Samson AG - On behalf of Jacobs Engineering SA
                                                                                                                                                        
ZOHR Develepoment Project Onshore
VISUAL, DIMENSIONAL AND TAGS CHECK, CERTIFICATION REVIEW of Pressure gauges, temperature gauges, thermowells - Vendor: WIKA Alexander Wiegand SE & Co. KG - On behalf of KT, eni SpA, Petrobel
 
SRU & CFP Project 
PIM Inspection on Main Air Blower - Vendor: Howden Turbo GmbH  - On behalf of Petro Rabigh Refining and Petrochemical Co.
 
LPIC EPC2 Project
Instrument wiring conduction / insulation test IEC 60364-6, Earthing check, Visual & dimensional, Nameplate, labelling and tagging check of all components of Refrigeration Unit Package - Vendor: Johnson Controls Systems & Services GmbH  - On behalf of Orpic Plastics LLC
 
LPIC EPC2 Project
FAT on Screw Feeders, Screw conveyors, MechaTron ConiSteel, MULTICOR S 160 Mass Flow units- Vendor: Schenck Process GmbH  - On behalf of Orpic Plastics LLC
                    
SRU & CFP Project
PIM / Pressure Tests / Functional Tests / Dimension inspections of Ball ON/OFF Valves - Vendor: Flowserve Flow Control GmBH (Argus)  - On behalf of Petro Rabigh Refining and Petrochemical Co.
 
LPIC EPC1 SCU Project
FAT / HydroTests of 1st Stage Suction Drums, Flow Static Mixers, Quench Mixers - Vendor: Ebner & Co KG - On behalf of ORPIC PLASTICS LLC /CBI
 
KSB Pump B Almeria - Maintenence Project
Measurement of the chromIum coatIng of Thrust BearIng Plate  - Vendor: KSB SE & Co. KGaA / Schmitz GmbH - On behalf of Endesa
                    
Kinyezerri II Power Plant Project
Audit inspection of Q.Sonic Plus Ultrasonic Flowmeter USM ( 6 inch )- Vendor: Honeywell Solutions /  Elster GmbH   - On behalf of CPPE / China
                                                                                                                     
Hassi R'mel Boosting Phase III Project Project
Calibration Inspection of Temperature – Pressure Gauges and Thermowells - Vendor:   WIKA Alexander Wiegand SE & Co. KG - On behalf of JGSItaly S.r.l
 
ZJDX Project Project
Inspecton of Observence, Tightness, Seat Leakage an Travel time testing of  Valves - Vendor: Samson AG - On behalf of Air Liquide
                    
DEI AS PONTES DSOX Project
Magnetic particle test (MT)of Booster Fans - Vendor: GE Power - On behalf of ENDESA GENERACION
 
PETRO RABIGH CFP/SRU Project
FAT of low voltage distribution panels - Vendor: Eaton Industrıes GmbH - On behalf of Kinetics Technology
 
TAP PMC PROJECT
FAT of Gas Metering / Analyzer Package (UFM’s) - Vendor: Elster GmbH ( Honeywell Solutions) - On behalf of TRANS ADRIATIC PIPELINE AG
                    
SRU & CFP Project
Dynamic balancing of Rotors - Vendor:  Howden Turbo GmbH  - On behalf of  Petro Rabigh Refining and Petrochemical Co.
 
Various Projects
Packing Inspection of MD Pumps - Vendor: Sulzer Pumpen (Deutschland) GmbH - On behalf of Enel Produzione Spa
 
Endesa Project
Hydro testing Inspection of Heat Barrier, Motor Housing and Thrust Bearing Housing - Vendor: KSB SE & Co. KG - On behalf of Endesa
                    
FARABI NORMAL PARAFFIN and Derivatives Complex Project
Visual Inspection, Dimension check, Pressure Testing and Functional checks of Closed Sampling Systems - Vendor: Fitok GmbH   - On behalf of L&T Hydrocarbon Engineering Limited
 
HMD UN Project Project
Running test, Performance test, NPSH test, Vibration measurement, Noise measurement, Tagging check of Common Flare knockout drum Pump & Closed drain pump - Vendor:  KSB SE & Co. KGaA - On behalf of JGC Corporation
 
YPC EVA Plant Yangzi Petrochemical Co. Project
Final Assessment of Safety Valves, Bursting Devices - Vendor: BASF AG - On behalf of Sinopec Europa GmbH
 
DUPONT TYVEK LINE 8 PROJECT
PIM and Inspection of Welding (Size, Appearance, Tech), VT of welds during fabrication, Material Stamping, Tracebility, LT-Leakage Test, Visual and Final Dimension (External Final Visual Inspection), Paint, Marking, Shipping Preparation ( Surface Preparation / Anchor Profile) of Fly Filter and Filter Elements and Cleaning units - Vendor: FILTRATION GROUP GMBH / Sub Vendor Waffenschmid Metallbau Gmbh - On behalf of KBR / DuPont de Nemours - Luxemburg
 
Johan Castberg SO17008 Project
Visual inspection Witness, certificates review of Level Gauges,Vendor: WIKA Instruments / Sub vendor KSR Kuebler Niveau-Messtecchnik AG - On behalf of Statoil / Equinor
 
LPIC EPC1 SCU Project
Shell test, Closure test, Functional test according according to API 598 Rev.10of Ram Type Blowdown Valves - Vendor: SchuF Armaturen und Apparatebau GmbH - On behalf of ORPIC PLASTICS LLC & CBI
 
Pegaga Project
Inspection of Performance & Accuracy (APZ-3.1 API -004) API 675 3rd, Repeatability and Linearity (APZ-3.1 API -005) PI 675 3rd, NPSHr Test(APZ-3.1 NPSHr), Mechanical Run Test, Hydro Test of Methanol Injection Pumps - Vendor: ProMinent GmbH- On behalf of Mubadala Petroleum
                    
ENAGAS TRANSPORTE SAU (Via EC) Project
Air pressure testing and leakage Test of Turbine type Flow meters, - Vendor: RMG MESSTECHNIK GmbH - On behalf of ENEGAS / EUROCONTROL
 
DUPONT TYVEK LINE 8 PROJECT Project
Interim and FAT of Laydown Belt Drive Motor Cooling Package - Vendor: Lauda Dr. R. Wobser GmbH & Co.KG , On behalf of KELLOGG BROWN & ROOT Ltd and KBR UK
 
Duqm Refinery Project EPC-3 Project
PIM for 33KV GIS , Vendor: Siemens AG, On behalf of Duqm Refinery and Petrochemical Industries and Applus ( This inspection has been performed thru Video-Conferencing )
 
Marghera Levante Brownfield Project
FAT of Foundation Plates - Vendor: Wendt- Noise Control GmbH - On behalf of ANSALDO ENERGIA S.P.A. and RINA org. ( This inspection has been performed remotely by Video-Conferencing and Video Call software )
 
(This is a partial list, otherwise the page will be too long )
 
Below listed are only some of the projects which we were part off.  No matter where you are located, we will be more than happy to be a  part of you. Our performance will be cost/effective and we will do our best to stay within your goal and expectations, not forgetting quality and safety.
Moho Nord Subsea Project, Congo              .    
 

The $10bn Moho Nord Subsea project is located around 75km off the coast of Pointe Noire in the Republic of Congo. It is the first deepwater offshore project in Congo at water depths ranging between 650m and 1,100m.First oil production from the Moho Nord Subsea project is scheduled for 2015 with the total output expected to reach 140,000 barrels of oil equivalent per day by 2017. The Moho Nord Marine-1 well, which was drilled to a depth of 2,465m, discovered 140m column of oil in the upper Miocene reservoir. The 2,340m deep Moho Nord Marine-2 discovery well, drilled 1.5km away from the first well, encountered two inter connected Upper Miocene oil reservoirs with 78m and 22m columns of oil.

LDPE Etileno XXI Project Braskem 
Maire Tecnimont Group of companies Suppliers and Contractors  - BASF

 

Think about 4,300 highly skilled professionals operating in the oil & gas processing, petrochemicals and fertilizer industries. This is Maire Tecnimont Group. An industrial leader in Engineering & Construction, Technology & Licensing, and Energy Business Development and Ventures. Listed on the Milan Stock Exchange, the Group is among the top-ranking worldwide engineering contractors.           .

 

Mariner Topside EPC project

 

The Mariner Field is located on the East Shetland Platform of the UK North Sea approximately 150km east of the Shetland Isles. The Mariner oil field development entails investments of more than USD 7 billion and is the largest new offshore development in the UK in more than a decade and is expected to start production in 2017. The field is estimated to produce for 30 years, with average production of around 55,000 barrels of oil per day over the plateau period from 2017 to 2020.
The Mariner Field consists of two shallow reservoirs, the Maureen Formation and the Heimdal Sandstones of the Lista Formation, with nearly 2 billion barrels of oil in place and expected reserves of more than 250 million barrels of oil . Both formations yield heavy oil of around 12 to 14 API.
 

ZAULIYAH Gas Plant Project
PDO of Oman

 

Petroleum Development Oman (PDO) is working on a new gas plant project at Zauliyah in central Oman adjacent to PDO’s existing Zauliyah Oil Production Station. The greenfield project will process non-associated gas, water and condensates from the Hasirah and Hawqa fields in the Bahja-Rima area of PDO’s concession to boost output by over 1 million standard cubic meters per day (mmscmd) of natural gas.The Hasirah oil reservoir has been in production since the mid 1980s, while  the Hawqa field was brought into operation in 1997.    

bottom of page